FIM FRAMEWORK Dissemination
FIM FRAME reports and publications are published here.
- FIM FRAME Joint research project fact sheet
includes project outcomes, duration, costs (.pdf)
- FIM FRAME poster
presented in Rome in October 2009 (.pdf)
- Start up meeting presentation
presented in Rome on 21 October 2009 (.pdf)
- WP1 report - The effectiveness and robustness of emergency plans for floods
finalised in June 2010 (9.6 MB .pdf)
- WP2 report - Comparison of currently available tools and enabling technologies for the emergency planning of floods
finalised in June 2010 (5.4 MB .pdf)
- Questionnaire dans le cadre du programme de recherche FIM FRAME Premiers enseignements
results from the questionnaires carried out as part of the research in French (.pdf)
- FIM FRAME - Interim report
produced in September 2010 (.pdf)
- Interim meeting presentation
presented in Madrid on 18 October 2010 (.pdf) ·
- An assessment of flood emergency plans in England and Wales, France and the Netherlands
peer reviewed paper published in Natural Hazards, July 2011. Visit journal website.
- Une évaluation des plans de gestion de crise « inondations » en Angleterre, en France et aux Pays-Bas
paper presented at the seventh Colloque Géorisque, Montpellier, France, January 2011 in French (.pdf)
- Tools to improve the production of emergency plans for floods – are they being used by the people that need them?
paper on the use of tools for the emergency planning of floods in England and Wales, and France finalised in July 2011 (.pdf)
- Case study fact sheet England – Brief details of the city of Sheffield case study carried out in England
finalised in August 2011 (.pdf)
- Case study fact sheet France no. 1 – Brief details of the Pilonc case study carried out in France
finalised in August 2011 (.pdf)
- Case study fact sheet France no. 2– Brief details of the Tarascon case study carried out in France
finalised in August 2011 (.pdf)
- Case study fact sheet the Netherlands– Brief details of the city of Dordrecht case study carried out in the Netherlands
finalised in August 2011 (.pdf)
- WP4 report – Details of the case studies carried out in England, France and the Netherlands
finalised in August 2011 (.pdf)
- FIM FRAME final report
finalised in August 2011 (.pdf)
- FIM FRAME method guidance document – Consultative draft
finalised in August 2011 (.pdf)
Presentations from the English end of project meeting, September 2011
Last updated: November 2011
|